Step by Step Procedure to Change the Job Through SMLP Communication from FX PLC

This is a step-by-step procedure to change the job through SMLP communication from FX PLC.

02/24/2026

Details

Procedure:

  1. Make ‘Set Offline’ bit (Acquisition Control Bit 7) ‘High’.
  2. Enter ‘Program Number’ (Value) in ‘Command Control input’.
  3. Make ‘Execute Command’ bit (Inspection Control-Bit 3) ‘High’.
  4. Confirm Command Completed & Failed feedback (Inspection Status-Bit 5&6).
  5. Make ‘Execute Command’ bit (Inspection Control-Bit 3) ‘Low’.
  6. Make “Set Offline” Bit (Acquisition Control Bit 7) “Low”.
  7. Confirm Program number in “command Control Output”.
Step by step procedure to change the job through SMLP communication from FX PLC_image-1
Step by step procedure to change the job through SMLP communication from FX PLC_image-2